Advanced Production Operations For Oil And Gas
Kode Training: Q. 6
Tanggal &Lokasi Training
JAKARTA |
BANDUNG |
BALI |
18-22 Agustus 2014 | 11-15 Ags’14 | 18-22 Ags’14 |
01-05 September 2014 20-24 Oktober 2014 10-14 November 2014 08-12 Desember 2014 |
15-19 Sept’14 | 01-05 Sept’14 |
Jam Pelaksanaan :
09.00 – 16.00 WIB
Tempat :
Alternatif Hotel: Ibis Group, Amos Cozy, The Park Lane, Harris Group, hotel lainnya yang akan kami konfirmasi kemudian
Pembicara / Fasilitator (Alternatif) :
- Tim Trainer Johnson Indonesia
Fee Training :
Rp 12.000.000/ person
Inc : Seminar Kit, Certificate, Lunch, Snack, Souvenir
Manfaat Training:
- Learn about the role of rock mechanics in completions, stimulation, and workovers
- Be able to give suggest or discover the procedures and techniques that increase production and cut operating costs
- Learn how to plan and implement well completions, workovers, stimulation treatments, and routine production operations with an efficiency that increases profits
- Implementation of appropriate technology, either from internal or external sources, in well design, whilst ensuring that the well value is maximized
- Be Able to identify and implement production improvement opportunities that can be carried out by either rig or non-rig well interventions
Materi :
- GEOLOGICAL CONSIDERATION
- Formation Rock
- Primary and Secondary Migrations
- Reservoir Traps
- RESERVOIR FUNDAMENTALS THEORY
- The Nature of Rocks and Fluids
- Porosity and Permeability
- Productivity Index
- Volumetric Calculation
- Other Calculations and Decline Curves
- FLUID FLOW
- Well Productivity
- Choke and Reservoir Fluids
- Inflow and Outflow
- PRODUCTION OPERATIONS
- Well head and Well Head EquipmentMultiple Orifice
- Routine Operations
- Opening and Shut-in Well Procedure
- WELL TESTING AND SATELLITE SYSTEM
- Test Separator Operations and Equipments
- Gas Systems Instruments
- Flare System and Depressurizing
- Pigging Techniques and ProceduresSampling and Analysis
- BS & W and API Gravity Measurement
- Protective Steam Tracing
- SURFACE PRODUCTION OPERATIONS
- Process, Level, Temperature and Pressure Controls
- Oil treating , Heater treater and Dehydrator
- Separators, Stage Separators and Sizing
- Two-phase and Three-phase Separation Skimmer tank and Flotation unit
- WELL PROBLEMS
- Low Production and Formation Damage
- Low Reservoir
- Plug-in Tubing or Perforations
- High Viscosity
- High Back Pressure
- Inadequate Artificial Lift
- Water Production and Mechanical Problem
- Protective Steam Tracing
- PRODUCTION LOGS
- WELL COMPLETIONS
- FLUID COMPLETIONS
- WORKOVERS
- OIL EMULSIONS
- Emulsion Built-up and Emulsifying Agent
- Sampling and Analysis
- Emulsion Treating
- Heat and Chemical Treatment
- Electrostatic Coalescing
- SCALE PROBLEMS
- Scale Composition, Prediction and IdentificationMechanic and Chemical methods Scale Prevention and Inhibitors
Target Peserta :
INFORMATION
For Registration, Please Contact :
Johnson Indonesia – Training Center
Dwi/ Narita/ Aini/ Nur
Telp. (021) 541 9152/ 541 7516, Hp: 0815 972 5020
E-mail:
Website:
DOWNLOAD BROSUR
FORM REGISTRASI